Metro West Tunnel CP‑2A
Installed, fit and field welding 156″ dia x 1.50″ and 144″ dia x 1.00″ pipeline in sections of 5 mile long hard rock tunnel including steel vertical shaft liners up to 400′ deep.
Installed, fit and field welding 156″ dia x 1.50″ and 144″ dia x 1.00″ pipeline in sections of 5 mile long hard rock tunnel including steel vertical shaft liners up to 400′ deep.