Completed & Active Projects List
Conduit 16 Tunnels
Fit and Weld 3200’ of casing pipe for the Conduit 16 Water Trans Main
Owner: Denver Water
Location: Denver, CO
Date: December 2018 to In Progress
Baxter Water Treatment Plant
Fit and Weld 5000’ of 120” x .508” thick double fillet steel pipe as well as other misc. water treatment plant work.
Owner: City of Philadelphia Water Dept.
Location: Philadelphia, PA
Date: January 2018 to In Progress
Conduit 16 Water Transmission Main
Fit and Weld 6000’ of 84” x .5” double fillet steel pipe.
Owner: Denver Water
Location: Denver, CO
Date: January 2018 to In Progress
The Dalles Dam
Install, Fit and Weld .75″ x 85″ butt joints and expansion joints for fish ladder piping
Owner: US Army Corps of Engineers
Location: Dalles, OR
Date: January 2018 to In Progress
Willow Creek Dam Rehabilitation
Install, Fit and Weld complex steel gate chamber liner plate with extremely limited space and complex bracing requirements. Project also includes 66”x .75” penstock installation in tunnel with 3” annular space
Owner: CO Dept of Natural Resources/ Colorado Parks and Wildlife
Location: Steamboat Lake State Park, CO
Date: June 2017 to In Progress
Relift Pump Station
Fit and weld miscellaneous steel pipe ranging from 6” to 144” diameter as well as high production welding for cofferdam shoring
Owner: Lower Colorado River Authority
Location: Lane City, TX
Date: November 2016 to In Progress
Catskill & Delaware Water Treatment Plant Piping
Fitting and Welding Water Treatment Plant 144″ to 48″ x9930′ Approx 309 joints
Owner: Dept. of Environmental Protection
Location: White Plains, NY
Date: September 2008 to January 2012
Olmsted Flowline Replacement Project
Fit and Weld 1200’ of 114″ diameter x .5” thick bell and spigot steel pipe. Install, fit, and weld 300’ of 114” butt welded steel pipe in tunnel.
Owner: Central Utah Water Conservancy Dist.
Location: Provo, UT
Date: October 2017 to December 2017
Grandfather Falls Penstock Replacement
Fit and Weld dual penstocks, 132” and 156” diameters x approximately 1000’
Owner: Wisconsin Public Service
Location: Irma, WI
Date: June 2017 to October 2017
Willamette Water Supply Pipeline
Fit and Weld 1000’ of 48″ diameter steel pipe or varying thicknesses and joint configurations.
Owner: Willamette Water Supply
Location: Willamette, OR
Date: June 2017 to August 2017
Navajo Gallup Pipeline Reach 12b
Fit and weld 36” diameter x .155” x 32 each restrained corner joints
Owner: Bureau of Reclamation
Location: Gallup, NM
Date: May 2017 to December 2017
GP Foley Waste Water Treatment Plant
Fit and weld 2600’ of 72” pipe, 400’ of 84” pipe and 60’ of 96”pipe.
Owner: Georgia Pacific
Location: Perry, FL
Date: May 2017 to October 2017
Union Pacific RR Emergency Service Order
Fit and Weld 60″ diameter x .750″ thick steel casing
Owner: Union Pacific Railroad
Location: Montello, NV
Date: March 2017 to March 2017
SNWA Lake Mead Wye
Subassemble, fit, and weld 181″ x .75″ wye fitting
Owner: Southern Nevada Water Authority
Location: Las Vegas, NV
Date: January 2017 to January 2017
Decatur to Limestone HDD Pipeline
Fit and weld 36” Diameter x .750” x 3000’ HDD open butt welded waterline as well as 5800’ double fillet welded pipeline of the same diameter and thickness.
Owner: Limestone Co Wtr & Swr Authority
Location: Decatur, AL
Date: November 2016 to October 2017
Herbert Hoover Dike Rehab
Fit and Bitt Weld 120″ Pipe
Owner: US Army Corps of Engineers
Location: Okeechobee, FL
Date: November 2016 to November 2016
CPV Valley Energy Center
Subassemble, fit, and weld 7′ to 24′ diameter manifolds for power plant cooling water
Owner: CPV Valley LLC
Location: New York City, NY
Date: September 2016 to November 2016
GC Inpoundment and Transmission Lines
Fit and Weld 11,000′ of 36″ – 66″ diameter steel pipe
Owner: Genesee County Drain Commissioner
Location: Flint, MI
Date: May 2016 to August 2016
Cathodic Continuation Project
Provide and install welded cathodic connection straps on interior of 60”diameter pipeline. All personnel and equipment access through 24” manholes at 5000’ on center.
Owner: Washington Suburban Sanitary Com.
Location: Mongomery Co, MD
Date: May 2016 to June 2016
Pine Creek Dam Safety Project
Install, Fit and Weld 144″ Diameter x .750″ x 500′ Penstock within 156″ Existing Tunnel under a dam. Includes design/use of pipe carrier.
Owner: US Army Corps of Engineers
Location: McCurtain County, OK
Date: April 2016 to January 2018
Staten Island Siphon Replacement
Install, Fit and Weld 72″ Diameter x 10,000′ Tunnel Liner under New York Harbor Includes design/use of pipe carrier.
Owner: NYC Economic Development Corp.
Location: Staten Island, NY
Date: July 2015 to January 2016
KWA 60” Transmission Main
Fit and Weld 60″ Diameter x 83,000’ of Water Transmission Pipe
Owner: Karegnondi Water Authority
Location: Flint, MI
Date: June 2015 to June 2016
KWA 66” Transmission Main
Fit and Weld 66″ Diameter x 71,000’ of Water Transmission Pipe
Owner: Karegnondi Water Authority
Location: Flint, MI
Date: June 2015 to May 2016
NASA John C. Stennis Stand A
Fitting and Welding high pressure cooling pipe 75” diameter x3000 feet full-pen butt welds. 8”-20” vault piping.
Owner: NASA
Location: Stennis Space Center, MS
Date: June 2015 to October 2015
I-95 Reconstruction CP2
Fit and Weld 84″ Diameter Pipe and 94” Diameter Hot-Tapping Saddles on Riveted Steel pipe.
Owner: PennDOT
Location: Philadelphia, PA
Date: May 2015 to December 2016
SR 99 (Big Bertha) TBM Rebuilding Project
Rebuilding Fitting and Welding 57.5’ Diameter Tunnel Boring Machine (worlds largest TBM) for Transportation Tunnel.
Owner: Washington State DOT
Location: Seattle, WA
Date: February 2015 to December 2015
S4AC Tunnel
Fit and Weld 66″ Diameter x 5,300’ Steel Tunnel Liner.
Owner: Colorado Springs Utilities
Location: Colorado Springs, CO
Date: December 2014 to March 2015
Intermediate Pumping Station
Welding 36″ – 60″ Diameter Water Transmission Pipeline
Owner: KWA
Location: Brown City, MI
Date: October 2014 to October 2015
Hedge Lane Supply Main
Fit and Weld 48″ Diameter x 27,000′ of Water Transmission Pipe.
Owner: Water One
Location: Olathe, KS
Date: October 2014 to October 2015
Silver Lake Tunnel
Install, Fit and Weld 96″ Diameter x 3,000′ Tunnel Liner Includes design/use of pipe carrier.
Owner: LADWP
Location: Burbank, CA
Date: July 2014 to September 2014
Harahan Pump to the Mississippi River
Fit and Weld 84″ Diameter x 6,200’ of Water Transmission Pipe.
Owner: US Army Corps of Engineers
Location: New Orleans, LA
Date: June 2014 to February 2016
NASA John C. Stennis Stand B
Fitting and Welding high pressure cooling pipe 96” diameter x 3000 feet full-pen butt welds for rocket stand cooling. 8”-112” vault piping.
Owner: NASA
Location: Stennis Space Center, MS
Date: May 2014 to June 2015
Lake Oswego Contracts 5 and 3B
Fitting and Welding water transmission pipe 36″-42” diameter.
Owner: City of Lake Oswego
Location: Portland, OR
Date: March 2014 to November 2014
Martin Hill Transmission Main
Welding 21,000′ of 54″ diameter pipe
Owner: City of Austin Public Works
Location: Austin, TX
Date: February 2014 to June 2015
SR 99 Bored Tunnel Project
Fitting and Welding 57.5’ Diameter Tunnel Boring Machine for Transportation Tunnel.
Owner: Washington State DOT
Location: Seattle, WA
Date: May 2013 to July 2013
San Francisco Bay Tunnel
Fitting and Welding 108″ Diameter x 30,000′ Steel Tunnel Liner.
Owner: Sanfrancisco Public Utilities Commission
Location: San Francisco, CA
Date: April 2013 to February 2015
McCook Main Tunnel System
Erecting, Fitting, and Welding 33.0’ diameter x 400’ Complex Tunnel Liner with large bifurcation
Owner: US Army Corp of Engineers
Location: Chicago, IL
Date: March 2013 to July 2014
Lake Texoma Outfall Section D
Fitting and Welding steel water transmission pipe 96″ diameter x 65,000′.
Owner: North Texas Municipal Water District
Location: Dallas, TX
Date: December 2012 to November 2013
Lithia H2S Removal Facility
Fitting and Welding 84″ – 36″ diameter stainless and carbon steel pipe and vessels
Owner: Veolia Water
Location: Lithia, FL
Date: August 2012 to December 2012
Powell Butte Reservoir
Fitting and Welding water transmission pipe 48″-90” diameter.
Owner: City of Portland
Location: Portland, OR
Date: July 2012 to June 2013
El Pico Water Treatment Plant
Fitting and Welding 16″ – 60″ Diameter steel pipeline
Owner: City of Laredo
Location: Laredo, TX
Date: May 2012 to October 2014
Austin WTP #4 Tunnel
Install, Fit and Weld 84″ Diameter x 3,900′ Tunnel Liner Includes design/use of pipe carrier. Install, Fit and Weld 108”x1.25” intake connection.
Owner: MWH Constructors, Inc.
Location: Austin, TX
Date: May 2012 to February 2013
Brightwater Conveyance BT3
Fitting and Welding 120″ Steel Tunnel Liner
Owner: King County, WA
Location: Seattle, WA
Date: April 2012 to June 2012
Devils Lake East End Outlet
Fitting and Welding 20″ thru 96″ diameter pipe
Owner: North Dakota Water Commission
Location: Devils Lake, ND
Date: April 2012 to May 2012
WSSC Bi-County Water Tunnel
Fitting and Welding 84″ Diameter x 30,000′ Steel Tunnel Liner.
Owner: Washington Suburban Sanitary Comm
Location: Chevy Chase, MD
Date: January 2012 to October 2014
Site J Subway Station
Erecting and welding steel columns up to 30”x30” butt welds.
Owner: Metropolitan Transit Authority
Location: Manhattan, NY
Date: January 2012 to November 2012
Tennessee I-40 Bridge-Seismic Retrofit
Erecting reinforcement steel casings on 90 Bridge Columns ranging from 10′ to 65′ tall amounting to 5400′ of full penetration butt welds.
Owner: State of Tennessee, DOT
Location: I-40 Bridge over Mississippi, TN
Date: August 2011 to July 2014
Grand Prairie Demonstration Project
Fit and weld water control project 120″ Diameter x 7,000′ Pipeline.
Owner: US Corp of Engineers
Location: Little Rock, AR
Date: August 2011 to November 2011
Columbus Water Resources Facility
Fit and weld 72” Diameter x .500” Water Pipeline.
Owner: Columbus Water Resources
Location: Columbus, GA
Date: July 2011 to July 2012
Mid-Jordan Light Rail
12″-48″ Steel Cylinder Reinforcement (SCR)
Owner: Utah Transit Authority
Location: Salt Lake City, UT
Date: January 2011 to August 2012
UDOT 11400 South Pipeline
Fit/Weld Water Transmission Main 60″ – 33″ x 7500′ Steel Water Pipeline
Owner: Utah Dept of Transportation
Location: West Jordan, UT
Date: December 2010 to April 2010
McClure Penstock Replacement
Fit and Weld 85″ x 7500′ Hydroelectric steel penstock pipeline included bridge crossings and tunnel sections.
Owner: Upper Peninsula Power Company
Location: Marquette, MI
Date: November 2010 to August 2011
Blue Ridge Dam Penstock Replacement
Install, Fit and Weld 147″ diameter x 1.00″ x 1000′ steel tunnel liner within 167″ existing steel penstock under dam. Includes design/use of pipe carrier and considerable demolition of existing structures to prepare the tunnel.
Owner: Tennessee Valley Authority (TVA)
Location: Blue Ridge, GA
Date: November 2010 to April 2011
Palo Verde Nuclear Generating Station, Cooling Tower Project, Unit 3
Install/Fit/Weld Nuclear Power Plant Cooling System 120″ manifold and piping Unit #3 during a critical shutdown.
Owner: Arizona Public Service
Location: Tonopah, AZ
Date: September 2010 to November 2010
Turnbull Hydroelectric Penstock
Install/Fit and Weld Hydroelectric Steel Penstock Pipe 108″ diameter x 3,000′
Owner: Turnbull Hydroelectic
Location: Great Falls, MT
Date: August 2010 to October 2010
Brushy Creek Water Treatment Plant Phase 1A
96″ – 36″ Fitting and welding Water Treatment Plant yard steel pipe
Owner: Brushy Creek Regional Utility Authority
Location: Austin, TX
Date: June 2010 to June 2012
Arrowhead Water Transmission
Fit and Weld water transmission pipe 54″-72″ diameter x 14,000′ pipeline.
Owner: Kansas City Water Services Dept.
Location: Kansas City, MO
Date: June 2010 to August 2011
MCWA- East Side Water Supply
Fitting and Welding water transmission pipe 48″ Diameter x 24,000′
Owner: Monroe County Water Authority
Location: Rochester, NY
Date: March 2010 to September 2010
Interstate 64 Transmission Main
Assemble/Fit/Weld Water Transmission Main 36″ Dia x 23,000′ Pipeline.
Owner: Louisville Water Company
Location: Louisville, KY
Date: March 2010 to June 2010
Palo Verde Nuclear Generating Station, Cooling Tower Project, Unit 1
Assemble/Fit/Weld Nuclear Power Plant Cooling System 120″ manifold and piping Unit 1 during a critical shutdown.
Owner: Arizona Public Service
Location: Tonopah, AZ
Date: March 2010 to May 2010
UDOT SR-92 Pipeline
Assemble/Fit/Weld Water Transmission Main 120″ and 72″ Dia x 5,000′ Pipeline.
Owner: UDOT and Bureau of Reclamation
Location: Lehi, UT
Date: February 2010 to June 2010
Juniper Ridge Hydroelectric
Fit/Weld 108″ Dia x 13,000′ Hydroelectric Penstock steel pipeline
Owner: Central Oregon Irrigation Dist.
Location: Bend, OR
Date: November 2009 to April 2010
Atlanta South Cobb Tunnel TBM Welding
Fitting and Welding 27′ Diameter Tunnel Boring Machine for combine sewer extension
Owner: Cobb County Water System
Location: Austell, GA
Date: June 2009 to August 2009
Pacific Corp Power Pole Modifications
Fit/Weld and Retrofit High Tension Power Poles, intermittent work on 2500 poles along 130 mile transmission section.
Owner: Pacific Corp Power
Location: Downey ID to Salt Lake City, UT
Date: April 2009 to August 2010
Pioneer Crossing Pipeline
Fit/Weld Water Transmission Main 60″ Dia x 27,000′ Pipeline.
Owner: UDOT and Central Utah Project
Location: Lehi, UT
Date: February 2009 to December 2009
Jordan Valley Water, Southwest Aquaduct Reach 2
Fit and Weld water transmission steel pipeline 66″ diameter x 11,000′
Owner: Jordan Valley Water Conservancy
Location: West Jordan, UT
Date: January 2009 to August 2010
MTA Subway Line No.7 Extension, Tunnel Boring Machine (TBM) Welding
Fitting and Welding 22’6″ Diameter Tunnel Boring Machine (TBM) for Subway Tunnel Extension.
Owner: Metropolitan Transit Authority
Location: Manhattan, NY
Date: January 2009 to April 2009
Siphon and Penstock Relocation
Fitting and Welding 60″ thru 72″ Penstock steel pipeline for hydroelectric station
Owner: Central Utah Water District
Location: Lehi, UT
Date: December 2008 to March 2009
Cat-Del UV Treatment Plant
Fitting and Welding 84″ Diameter Stainless steel piping for “Worlds Largest Water Treatment Plant”
Owner: Department of Environmental Protection
Location: Valhalla, NY
Date: October 2008 to November 2011
42″ Finished Water Transmission Main
Fitting and Welding steel pipe water transmission line 42″ x 19,000′. Approx 488 joints, plus Butt Straps.
Owner: Kansas Water District #1
Location: Olathe,KS
Date: August 2008 to January 2010
Crystal Creek Pipeline
Fitting and Welding 30″ x 16,000′ steel water pipeline
Owner: Washington County Water Conservancy District
Location: Near Zion National Park, UT
Date: August 2008 to November 2009
Lake Dorothy Hydroelectric Project Penstock
Fitting and Welding water transmission penstock 48″ to 60″ x 7,000′. Approx 177 joints, plus Butt Straps.
Owner: Alaska Electric Light and Power
Location: Juneau, AK
Date: August 2008 to July 2009
Spanish Fork Canyon Reach 1
Fitting and Welding steel water transmission pipeline 96″ x 11,000′. Approx 300 joints, plus Butt Straps.
Owner: Central Utah Water District
Location: Spanish Fork, UT
Date: July 2008 to March 2009
FKAA Transmission Main Relocation
Fitting and Welding water transmission pipe 36″ x 9,000′. Approx 225 joints, plus Butt Straps.
Owner: Florida DOT
Location: Key Largo, FL
Date: April 2008 to January 2009
Johnson County Transmission Main
Fitting and Welding steel water transmission pipeline 60″ x 54,000′. Approx 1300 joints, plus Butt Straps.
Owner: Kansas Water District #1
Location: Kansas City,KS
Date: March 2008 to November 2009
Lost Canyon Pump Station
Fitting and Welding steel water pipe 16″ thru 30″.
Owner: Central Utah Water District
Location: Wanship, UT
Date: March 2008 to April 2008
Stanton Energy Center Unit B
Fitting and Welding cooling tower intake and discharge pipe 54″ .
Owner: Stanton Energy Center
Location: Orlando, FL
Date: March 2008 to March 2008
West Water Transmission Main
Fitting and Welding water transmission pipe 64″ x 20,000′. Approx 400 joints, plus Butt Straps.
Owner: Charlotte Mecklenburg Utilities
Location: Charlotte, NC
Date: February 2008 to October 2009
Southwest Water Transmission Main
Fitting and Welding water transmission pipe 48″ x 19,000′. Approx 380 joints, plus Butt Straps.
Owner: Charlotte Mecklenburg Utilities Department
Location: Charlotte, NC
Date: January 2008 to September 2009
Harahan Pump Station
Fitting and Welding pump station piping and three parallel 84″ x 700′ (2100′ Total) steel pipelines. Approx 50 joints, plus Butt Straps.
Owner: Army Corps of Engineers
Location: New Orleans, LA
Date: January 2008 to July 2008
Sycamore Road Improvements
Fitting and Welding water transmission pipe 72″ x 8,700′ and 60″ x 16,000′ . Approx 580 joints plus butt straps.
Owner: Gwinnett County Dept of Water Res.
Location: Buford, GA
Date: January 2008 to June 2008
Water One Water Treatment Plant
Fitting and Welding water treatment plant steel pipe 36″ thru 84″ .
Owner: Kansas Water District #1
Location: Kansas City, KS
Date: November 2007 to September 2009
Jordanelle Reservoir Hydroelectric Penstock
Fitting and Welding complex 66″ thru 84″ steel penstock with open butt welds.
Owner: Central Utah Water Conservancy Dist.
Location: Heber City, UT
Date: September 2007 to December 2007
Ridges Basin Inlet Conduit, Pipeline and Tunnel
Fitting and Welding water transmission pipe 72″ x .563″ x 8000′ plus designed and built pipe carrier, pipe support system, field install & welding 72″ x .375″ x 700′ tunnel Liner.
Owner: Bureau of Reclamation
Location: Durango, CO
Date: June 2007 to June 2007
800 North Pipeline
Fitting and Welding 36″ x 9,400′ steel water pipeline
Owner: Central Utah Water Conservancy District
Location: Orem, UT
Date: February 2007 to August 2007
Rio Grande River Directional Drill
Fitting and Welding 36″ x .75″ x 2100′ open butt welded horizontal directional drill (HDD)
Owner: South Valley Drinking Water
Location: Albuquerque, NM
Date: January 2007 to March 2007
Eagle Mountain Connection Pipeline, Contract B
Fitting and Welding water transmission pipe 84″ x 50,000′. Approx 1100 joints, plus Butt Straps.
Owner: Tarrant County Water District
Location: Fortworth, TX
Date: December 2006 to March 2008
Eagle Mountain Pump Station
Fitting and Welding water pump station pipe 114″ thru 48″ x 5000′. Approx 130 joints, plus Butt Straps.
Owner: Tarrant County Water District
Location: Benbrook, TX
Date: November 2006 to December 2007
SAWS Twin Oaks Water Treatment Plant
Fitting and Welding water treatment plant pipe 96″ thru 36″ x 4800′. Approx 120 joints, plus Butt Straps.
Owner: San Antonio Water Dept.
Location: San Antonio, TX
Date: November 2006 to December 2007
North Buffalo Tranfer Force Main
Fitting and Welding steel water transmission pipeline 54″ and 48″ x 25,000′. Approx 500 joints, plus Butt Straps.
Owner: City of Greensboro
Location: McLeansville, NC
Date: October 2006 to November 2007
Raw Water Transmission Water Line
Fitting and Welding steel water transmission pipeline 72 x 26,000′. Approx 530 joints, plus Butt Straps.
Owner: City of Albuquerque
Location: Albuquerque, NM
Date: October 2006 to September 2007
Fern Hill Reservoir #2
42″ thru 72″ x 5000′ steel water pipeline
Owner: Joint Water Comission
Location: Forest Grove, OR
Date: July 2006 to November 2006
Big Sand Wash Pipeline
Fitting and Welding steel water transmission pipeline 32 x 92,000′. Approx 1300 joints, plus Butt Straps.
Owner: Central Utah Project (CUP)
Location: Roosevelt, UT
Date: June 2006 to October 2007
Tampa Bay Water Pipeline
Fitting and Welding 84″ x 29,000′ steel water pipeline
Owner: City of Tampa
Location: Tamps, FL
Date: April 2006 to November 2006
Central Brown County Pipeline, Contract C & I
Fitting and Welding steel water transmission pipeline 48 x 100,000′. Approx 1990 joints, plus Butt Straps.
Owner: Brown County Water Authority
Location: Greenbay, WI
Date: January 2006 to May 2007
Central Brown County Pipeline, Contract G
Fitting and Welding water transmission pipe 48 x 48,000′. Approx 1000 joints, plus Butt Straps.
Owner: Brown County Water Authority
Location: Greenbay, WI
Date: January 2006 to November 2006
Albuquerque Water Treatment Plant
Fitting and Welding steel water transmission pipeline from 30″ to 96″ diameter x 12,000′. Approx 290 joints, plus Butt Straps.
Owner: City of Albuquerque
Location: Albuquerque, NM
Date: July 2005 to December 2006
Lake Pleasant Waterline
Fitting and Welding steel water transmission pipeline 78″ diameter x 45,000′ with 206 Joints total
Owner: City of Phoenix
Location: Phoenix, AZ
Date: June 2005 to November 2006
Jersey City Aqueduct Relocation
Fitting and Welding dual 72″ x 7700′ water transmission lines including railroad bores
Owner: New Jersey Turnpike Authority
Location: Secaucus, NJ
Date: June 2005 to May 2006
Point of The Mountain Aqueduct
Fitting and Welding steel water transmission pipeline 60″ and 84″ diameter x 88,000′ system.
Owner: Metro Water District of Salt Lake
Location: Draper, UT
Date: April 2005 to April 2007
54″ Parallel Raw Water Transmission Main, Phase 1-4
Fitting and Welding 54″ x 76,000′ steel water transmission pipeline including 1,542 pipe joints total.
Owner: City of Greenbay
Location: Luxemburg, WI
Date: April 2005 to May 2006
Williamson County Raw Water Main
Fitting and Welding 48″ x 5,000′ Raw Water Main steel pipeline
Owner: Williamson County
Location: Locatoin: Salado, TX
Date: April 2005 to April 2005
Tennessee I-40 Bridge-Seismic Retrofit
Erecting reinforcement steel casings on 34 Bridge Columns ranging from 35′ to 112′ tall amounting to 5400′ of full penetration butt welds
Owner: State of Tennessee, DOT
Location: I-40 Bridge over Mississippi, TN
Date: January 2005 to March 2008
Point of The Mountain Water Treatment Plant
Fitting and Welding water transmission pipe from 30″ to 108″ diameter. Approx 175 joints, plus Butt Straps.
Owner: Metro Water District of Salt Lake
Location: Draper, UT
Date: January 2005 to March 2007
Pilot Butte Canal Pipeline Project
Fitting & field welding steel pipeline 96″ x .313″ Double Fillet welds including approx 115 joints.
Owner: Central Oregon Irrigation District
Location: Redmond, OR
Date: November 2004 to March 2005
Pinnacles Pipeline Replacement
Fitting and welding 70″ x 5000′ of steel penstock pipeline, installed by helicopter
Owner: City of Danville
Location: Danville, VA
Date: November 2004 to December 2004
New Jersey- Eastern Transmission Reinforcement, Phase 2
Install, Fit and Welding 72″ x .710″ x 1500′ steel tunnel pipe, Including 50 deep shaft connections to the tunnel elevation
Owner: Elizabethtown Water Company
Location: Elizabeth, NJ
Date: June 2004 to June 2004
Richland – Chambers Pump Station Modifications
Installing fitting & field welding steel pipe at water treatment plant 36″ to 120″ dia. x 0.375″ to 0.625″ including 231 butt straps . Installed hand railing and stainless steel process piping to pumps and valves.
Owner: Tarrant Regional Water District
Location: Ennis & Waxahachie, TX
Date: March 2004 to December 2004
Gwinnett County, Shoal Creek Raw Water Intake, Contract 2
Fit and field weld 72″ dia. x 15,000′ x 0.500″ steel pipeline.
Owner: Gwinnett County Water
Location: Buford, GA
Date: October 2003 to August 2004
Atlanta -Fulton County WTP Improvements, Phase 2.5
Fit and field welding 72″ diameter x .500″ steel pipeline connecting pumps and valves.
Owner: Atlanta Fulton County Water Resources
Location: Alpharetta, GA
Date: October 2003 to August 2004
Walnut Hill Water Treatment Plant
Install, fit and field welding 68 ” to 173 ” dia. steel pipe manifold to connect new water main to tunnels for the city of Boston, MA.
Owner: Massachusetts Water Resources Authority
Location: Marlborough, MA
Date: October 2003 to January 2004
Gwinnett County, Shoal Creek Raw Water Intake, Contract 1
Fit and field welding 72″ diameter x 6500′ .500″ steel pipeline.
Owner: Gwinnett County Water
Location: Buford, GA
Date: October 2003 to December 2003
Gwinnett County, Shoal Creek Raw Water Intake, Contract 1
Fit and field welding 30″ to 72″ steel pipeline connecting to pumps and valves.
Owner: Gwinnett County Water
Location: Buford, GA
Date: October 2003 to December 2003
Plant Yates, Cooling System Replacement
Designed and built large pipe carriers, pipe support system, field installation & welding 240 Pieces of 60″ through 102″ dia. steel cooling system tunnel pipe, including 60 field fabricated connections to the tunnel ranging 6″ to 60″ in diameter. All work completed on time during two 35 day outages.
Owner: Georgia Power, Plant Yates
Location: Newnan, GA
Date: October 2003 to December 2003
Carrizo Aquifer Storage and Recovery – Pipeline 2B
Fit and field welding 60″ diameter x 43,000′ steel water pipeline.
Owner: San Antonio Water System
Location: San Antonio, TX
Date: February 2003 to September 2003
Spot Pond Rehabilitation
Install, fit, weld 150 ea. repair bands within 48″ x 0.375″ existing steel underground pipeline.
Owner: Massachusetts Water Authority
Location: Cambridge, MA
Date: January 2003 to February 2003
Prospect Wood Stave Flowline Replacement
Install, fit and field welding 90″ diameter x 7000′ dual steel pipeline penstock lines. Which replaced a wood stave pipeline.
Owner: PacificCorp
Location: Prospect, OR
Date: October 2002 to December 2002
Tudor Road Water Line Repair
Remove and replace short section of failing PCCP with steel pipe section and connecting system using butt straps
Owner: City of Anchorage
Location: Anchorage, AK
Date: September 2002 to September 2002
Metro West Tunnel CP‑1
Install, assemble and field welding 153″ dia x 1.25″ and 120″ dia. x 0.625 to 0.875″ steel pipeline in sections of 7 mile hard rock tunnel including steel vertical shaft liners up to 450′ deep. 1st Phase Completed December 2001
Owner: Massachusetts Water Authority
Location: Southborough, MA
Date: June 2002 to August 2002
Metro West Tunnel CP‑2A
Installed, fit and field welding 156″ dia x 1.50″ and 144″ dia x 1.00″ pipeline in sections of 5 mile long hard rock tunnel including steel vertical shaft liners up to 400′ deep.
Owner: Massachusetts Water Authority
Location: Framingham, MA
Date: March 2002 to July 2002
Olmsted Flowline Replacement
Field welding 90″ & 120″ dia x .500″ x 12,000′ above ground and buried pipeline, including steel tunnel liner installation.
Owner: Central UT Water Conserv. Dist.
Location: Provo Canyon, UT
Date: November 2001 to March 2004
North Hillsborough Transmission Line 2B
Field welding 72″ diameter x 28,000′ steel water transmission pipeline
Owner: Hillsborough County, OR
Location: Tualatin, OR
Date: October 2001 to June 2002
Lake Chapman Water Supply Project
Field welding 72″ diameter x 93,000′ steel water transmission pipeline
Owner: City of Irving, TX
Location: McKinney, TX
Date: October 2001 to June 2002
South Central Hillsborough Intertie – Contract 1
Fitting and field welding 72″ diameter x 40,000′ steel water transmission pipeline in very adverse, wet conditions
Owner: Tampa Bay Water
Location: Riverview, FL
Date: August 2001 to June 2002