Willow Creek Dam Rehabilitation

Install, Fit and Weld complex steel gate chamber liner plate with extremely limited space and complex bracing requirements. Project also includes 66”x .75” penstock installation in tunnel with 3” annular space

Owner: CO Dept of Natural Resources/ Colorado Parks and Wildlife
Location: Steamboat Lake State Park, CO
Date: June 2017 to In Progress

Dam Rehabilitation, Tunnel & Shaft Liners

6

Pine Creek Dam Safety Project

Install, Fit and Weld 144″ Diameter x .750″ x 500′ Penstock within 156″ Existing Tunnel under a dam. Includes design/use of pipe carrier.

Owner: US Army Corps of Engineers
Location: McCurtain County, OK
Date: April 2016 to January 2018

Dam Rehabilitation, Tunnel & Shaft Liners

McClure Penstock Replacement

Fit and Weld 85″ x 7500′ Hydroelectric steel penstock pipeline included bridge crossings and tunnel sections.

Owner: Upper Peninsula Power Company
Location: Marquette, MI
Date: November 2010 to August 2011

Dam Rehabilitation, Demolition Projects, Power Plants & Penstocks

5

Blue Ridge Dam Penstock Replacement

Install, Fit and Weld 147″ diameter x 1.00″ x 1000′ steel tunnel liner within 167″ existing steel penstock under dam. Includes design/use of pipe carrier and considerable demolition of existing structures to prepare the tunnel.

Owner: Tennessee Valley Authority (TVA)
Location: Blue Ridge, GA
Date: November 2010 to April 2011

Dam Rehabilitation, Demolition Projects, Power Plants & Penstocks, Tunnel & Shaft Liners

2

Jordanelle Reservoir Hydroelectric Penstock

Fitting and Welding complex 66″ thru 84″ steel penstock with open butt welds.

Owner: Central Utah Water Conservancy Dist.
Location: Heber City, UT
Date: September 2007 to December 2007

Dam Rehabilitation, Power Plants & Penstocks