Grandfather Falls Penstock Replacement

Fit and Weld dual penstocks, 132” and 156” diameters x approximately 1000’

Owner: Wisconsin Public Service
Location: Irma, WI
Date: June 2017 to October 2017

Pipelines Cross Country, Power Plants & Penstocks

2

CPV Valley Energy Center

Subassemble, fit, and weld 7′ to 24′ diameter manifolds for power plant cooling water

Owner: CPV Valley LLC
Location: New York City, NY
Date: September 2016 to November 2016

Fittings & Fabrication, Power Plants & Penstocks

McClure Penstock Replacement

Fit and Weld 85″ x 7500′ Hydroelectric steel penstock pipeline included bridge crossings and tunnel sections.

Owner: Upper Peninsula Power Company
Location: Marquette, MI
Date: November 2010 to August 2011

Dam Rehabilitation, Demolition Projects, Power Plants & Penstocks

5

Blue Ridge Dam Penstock Replacement

Install, Fit and Weld 147″ diameter x 1.00″ x 1000′ steel tunnel liner within 167″ existing steel penstock under dam. Includes design/use of pipe carrier and considerable demolition of existing structures to prepare the tunnel.

Owner: Tennessee Valley Authority (TVA)
Location: Blue Ridge, GA
Date: November 2010 to April 2011

Dam Rehabilitation, Demolition Projects, Power Plants & Penstocks, Tunnel & Shaft Liners

2

Palo Verde Nuclear Generating Station, Cooling Tower Project, Unit 3

Install/Fit/Weld Nuclear Power Plant Cooling System 120″ manifold and piping Unit #3 during a critical shutdown.

Owner: Arizona Public Service
Location: Tonopah, AZ
Date: September 2010 to November 2010

Demolition Projects, Fittings & Fabrication, Power Plants & Penstocks

Turnbull Hydroelectric Penstock

Install/Fit and Weld Hydroelectric Steel Penstock Pipe 108″ diameter x 3,000′

Owner: Turnbull Hydroelectic
Location: Great Falls, MT
Date: August 2010 to October 2010

Power Plants & Penstocks

Palo Verde Nuclear Generating Station, Cooling Tower Project, Unit 1

Assemble/Fit/Weld Nuclear Power Plant Cooling System 120″ manifold and piping Unit 1 during a critical shutdown.

Owner: Arizona Public Service
Location: Tonopah, AZ
Date: March 2010 to May 2010

Demolition Projects, Fittings & Fabrication, Power Plants & Penstocks

Juniper Ridge Hydroelectric

Fit/Weld 108″ Dia x 13,000′ Hydroelectric Penstock steel pipeline

Owner: Central Oregon Irrigation Dist.
Location: Bend, OR
Date: November 2009 to April 2010

Power Plants & Penstocks

Pacific Corp Power Pole Modifications

Fit/Weld and Retrofit High Tension Power Poles, intermittent work on 2500 poles along 130 mile transmission section.

Owner: Pacific Corp Power
Location: Downey ID to Salt Lake City, UT
Date: April 2009 to August 2010

Power Plants & Penstocks, Specialty Projects

Siphon and Penstock Relocation

Fitting and Welding 60″ thru 72″ Penstock steel pipeline for hydroelectric station

Owner: Central Utah Water District
Location: Lehi, UT
Date: December 2008 to March 2009

Pipelines Cross Country, Power Plants & Penstocks

2

Lake Dorothy Hydroelectric Project Penstock

Fitting and Welding water transmission penstock 48″ to 60″ x 7,000′. Approx 177 joints, plus Butt Straps.

Owner: Alaska Electric Light and Power
Location: Juneau, AK
Date: August 2008 to July 2009

Pipelines Cross Country, Power Plants & Penstocks

2

Jordanelle Reservoir Hydroelectric Penstock

Fitting and Welding complex 66″ thru 84″ steel penstock with open butt welds.

Owner: Central Utah Water Conservancy Dist.
Location: Heber City, UT
Date: September 2007 to December 2007

Dam Rehabilitation, Power Plants & Penstocks

4

Ridges Basin Inlet Conduit, Pipeline and Tunnel

Fitting and Welding water transmission pipe 72″ x .563″ x 8000′ plus designed and built pipe carrier, pipe support system, field install & welding 72″ x .375″ x 700′ tunnel Liner.

Owner: Bureau of Reclamation
Location: Durango, CO
Date: June 2007 to June 2007

Pipelines Cross Country, Power Plants & Penstocks

4

Point of The Mountain Aqueduct

Fitting and Welding steel water transmission pipeline 60″ and 84″ diameter x 88,000′ system.

Owner: Metro Water District of Salt Lake
Location: Draper, UT
Date: April 2005 to April 2007

Pipelines Cross Country, Power Plants & Penstocks

4

Plant Yates, Cooling System Replacement

Designed and built large pipe carriers, pipe support system, field installation & welding 240 Pieces of 60″ through 102″ dia. steel cooling system tunnel pipe, including 60 field fabricated connections to the tunnel ranging 6″ to 60″ in diameter. All work completed on time during two 35 day outages.

Owner: Georgia Power, Plant Yates
Location: Newnan, GA
Date: October 2003 to December 2003

Demolition Projects, Power Plants & Penstocks, Specialty Projects, Tunnel & Shaft Liners, Water Treatment Plants & Pump Stations

3

Prospect Wood Stave Flowline Replacement

Install, fit and field welding 90″ diameter x 7000′ dual steel pipeline penstock lines. Which replaced a wood stave pipeline.

Owner: PacificCorp
Location: Prospect, OR
Date: October 2002 to December 2002

Pipelines Cross Country, Power Plants & Penstocks